If you represent an IT startup or are studying in the last courses of an IT university, then this information is for you! Apply for participation, solve the real case of the country's industrial gi
Develop a system for determining the volume/weight of slag in the slag pit PC 4
Transportation of slag by dump trucks to the crushing and screening complex (DSK 600) for subsequent crushing. Weighing the volume of slag with the bowl is carried out by slag trucks; the bowl is also weighed separately by a slag truck; the difference between a bowl full of slag and an empty ladle is equal to the weight of the slag. It is necessary to automate the process of accounting for unloaded OPSH dump trucks
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a solution to prevent ore material from “hanging” in bunkers
At a certain period, to summarize the balance of the metal, surveyors carry out work to measure the “bed”. The measurement is carried out by weighing the ingots with screenings, and the “bed” is also measured separately after collecting the ingots. As a result, the amount of adhering screenings is subtracted from the initial values of the made “bed” before releasing the metal. The task is to automate the entire process
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
Develop online advisors for preparing the “bed” for casting metal according to given dimensions
Melting shop No. 4, Aktobe Ferroalloy Plant Develop online advisors for preparing the “bed” for casting metal according to given dimensions
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
Hub Perks
Develop a prototype of a mobile metal and slag sampler
Propose a rational engineering solution. Melting shop №4, Aktobe Ferroalloy Plant
Making decisions before ...
до 26.04.24
Область задачи
Other technological solutionsNumber of applications
0
Leakage of coolant from the furnace roof located under the concrete
Develop a solution for detecting coolant leaks from furnace roofs located under concrete.
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
Predictive determination of the condition of furnace linings and determination of residual life
Propose a rational engineering solution.
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a system for diagnosing and predicting gas waste clogging
Propose a rational engineering solution.
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
Propose a solution for predicting pressure surges on furnaces
Aktobe Ferroalloy Plant, Melting Shop №4
Making decisions before ...
до 19.04.24
Область задачи
New production technologiesNumber of applications
0
Develop a solution for dust aspiration/collection at the facilities of the 4th workshop of the Aktobe Ferroalloy Plant
In the smelting shop No. 4 of the Aktobe Ferroalloy Plant, there is currently a problem with cleaning up spills of charge materials and dust, which leads to shutdowns of process equipment and the involvement of additional personnel. It is necessary to develop a solution for dust aspiration/collection at the facilities of the 4th workshop
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
0
To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Aktobe Ferroalloy Plant, Melting Shop No. 4 (charge preparation area, finished product area), Central FiofiOF To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Making decisions before ...
до 19.04.24
Область задачи
New production technologiesNumber of applications
0
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Making decisions before ...
до 19.04.24
Область задачи
Other technological solutionsNumber of applications
1
Develop a solution to prevent ore material from “hanging” in bunkers.
At the charge preparation site of the Aktobe Ferroalloy Plant, raw materials for ferroalloy furnaces are supplied using conveyors into steel closed storage bins for intermediate storage of raw materials. From the bins, the raw materials are distributed to other conveyors for dosing into the furnace. In the autumn-winter period, bulk material (ore) sticks to the walls of the bunker, which leads to a significant decrease in the useful volume of the bunker, incorrect readings of level gauges, failures in the rhythmic operation of the charge conveyor path, and losses in the operation of smelting furnaces.
Making decisions before ...
до 19.04.24
Область задачи
New production technologiesNumber of applications
0
Develop a solution to prevent railway vehicles from colliding with each other
Location - Aktobe Ferroalloy Plant, Aktobe railway tracks (ZhDC). Internal transportation of ferroalloy ingots between the smelting shops and the finished product warehouse, as well as other materials, is carried out by the enterprise's railway. The speed of the train is no more than 7 km/h, transportation is carried out accompanied by technical personnel. Internal railway crossings are not equipped with barriers/barriers. Sometimes minor collisions between vehicles and trains occur. A solution needs to be developed to prevent rail vehicles from colliding with each other.
Making decisions before ...
до 19.04.24
Область задачи
New production technologiesNumber of applications
0
Разработка СКИП (Task manager)
Необходимо разработать систему контроля исполнения поручений позволяющая полностью автоматизировать процесс работы с поручениями
Making decisions before ...
до 25.04.24
Область задачи
Intelligent control systemsNumber of applications
0
Watermark Remover: Development of a neural network to remove watermarks from photos
Machine learning is required to create and train a neural network that can remove watermarks from photos in the shortest possible time.
Making decisions before ...
до 25.04.24
Область задачи
New production technologiesNumber of applications
1
Development of your own traffic video analytics software
First of all, gathering a team, joint study and determining the necessary activities - the main thing is to start so that the developers understand the task first. Automatic counting of vehicles passing through intersections (all directions, straight, right, left, U-turn, etc.) through video of drones that film traffic movements at an altitude of 500 meters and cover several intersections. There are world-wide analogues; upon introduction, we will show you how these software work
Making decisions before ...
до 25.04.24
Область задачи
Neurotechnology and artificial IntelligenceNumber of applications
2