Develop online advisors for preparing the “bed” for casting metal according to given dimensions
Melting shop No. 4, Aktobe Ferroalloy Plant Develop online advisors for preparing the “bed” for casting metal according to given dimensions
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a prototype of a mobile metal and slag sampler
Propose a rational engineering solution. Melting shop №4, Aktobe Ferroalloy Plant
Making decisions before ...
до 26.04.24
Область задачи
Other technological solutionsNumber of applications
1
Leakage of coolant from the furnace roof located under the concrete
Develop a solution for detecting coolant leaks from furnace roofs located under concrete.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Predictive determination of the condition of furnace linings and determination of residual life
Propose a rational engineering solution.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Develop a system for diagnosing and predicting gas waste clogging
Propose a rational engineering solution.
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
Propose a solution for predicting pressure surges on furnaces
Aktobe Ferroalloy Plant, Melting Shop №4
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Develop a solution for dust aspiration/collection at the facilities of the 4th workshop of the Aktobe Ferroalloy Plant
In the smelting shop No. 4 of the Aktobe Ferroalloy Plant, there is currently a problem with cleaning up spills of charge materials and dust, which leads to shutdowns of process equipment and the involvement of additional personnel. It is necessary to develop a solution for dust aspiration/collection at the facilities of the 4th workshop
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
0
To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Aktobe Ferroalloy Plant, Melting Shop No. 4 (charge preparation area, finished product area), Central FiofiOF To propose a solution for increasing the wear resistance of the gate valve in the charge processing department, processing department and finished product shipment
Making decisions before ...
до 03.05.24
Область задачи
New production technologiesNumber of applications
0
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Develop a system for measuring ore residues at the ore warehouse of the Aktobe Ferroalloy Plant (as well as finished products and slag).
Making decisions before ...
до 03.05.24
Область задачи
Other technological solutionsNumber of applications
1
Develop a solution to prevent ore material from “hanging” in bunkers.
At the charge preparation site of the Aktobe Ferroalloy Plant, raw materials for ferroalloy furnaces are supplied using conveyors into steel closed storage bins for intermediate storage of raw materials. From the bins, the raw materials are distributed to other conveyors for dosing into the furnace. In the autumn-winter period, bulk material (ore) sticks to the walls of the bunker, which leads to a significant decrease in the useful volume of the bunker, incorrect readings of level gauges, failures in the rhythmic operation of the charge conveyor path, and losses in the operation of smelting furnaces.